A very muddy first day in the field

Last night’s rain made our first day in the field a very muddy experience. That isn’t normal for Greece in June. Mud caked the bottom of our shoes, making them heavy and unwieldy. At some point I tried to kick mud off of my shoe and the entire shoe came off my foot, flying across an olive grove. (At another point I was also successfully kicking mud at Bill, which amused me and annoyed him). It was also unseasonably cool and overcast:

IMG_3452

But it didn’t rain, and that allowed us to stay in the field. After a training session on survey methodology (run by Bill) and identifying tile (run by Sarah), we began walking units. Between our five field teams, we managed to cover over 40 survey units, even though some of them were difficult to walk and others were full of surface material (both of which tends to slow walkers down).

IMG_3473

 

The team leaders and field walkers all did an excellent job. You never would have know that this was entirely new to almost all of them. All in all, it was an extremely good, productive, and tiring day. This afternoon the teams will start entering their data from their field forms.

IMG_3470

 

 


Leave a Reply

Your email address will not be published. Required fields are marked *